London mayor launches investigation into Garden Bridge procurement
– Margaret Hodge
London mayor Sadiq Khan has ordered a review into Thomas Heatherwick’s proposed £185m Garden Bridge project, which will investigate whether taxpayers have had value for money for their contribution.
Dame Margaret Hodge MP, the former chair of the UK’s Public Accounts Committee, will conduct the review. She will focus on the procurement process around the project, and analyse whether the required standards have been met around transparency and openness. According to Khan, the review will push the project’s developers “to achieve higher standards of accountability and transparency [the project] has so far been lacking.”
The idea of a garden bridge across the River Thames between South Bank and Temple was first pitched by British actor Joanna Lumley and received strong backing from Khan’s predecessor Boris Johnson, before his tenure as mayor ended in May. However, the project has been mired in controversy over the procurement process, which saw Heatherwick Studio’s vision selected over competing bridge designs from Wilkinson Eyre and Marks Barfield.
According to an Architect's Journal investigation, Heatherwick was present for several meetings with mayoral staff, including Johnson, before the contest was held.
Khan has previously backed the project on the proviso that no new London taxpayers’ funds should be committed to and that it should be a genuinely public and open space with strict limitations on how often it is closed for private events. However, he has previously called for a full investigation into how the project has developed.
Now Hodge will assess the findings of previous reviews and interview current and former staff of Transport for London and the Greater London Authority to investigate the conduct of the organisations since the project was first proposed. The review, which will cost the taxpayer £25,000, will culminate in a report to the mayor setting out any lessons that should be learnt in order to improve the conduct of potential and approved projects in the future.
“I’m clear that since the beginning of the project there hasn’t been the necessary standard of transparency and openness around the Garden Bridge,” said Khan. “Nearly £40m of public money has already been spent on the Garden Bridge project, and Londoners deserve far more information about the decisions that have been made around how their money is being spent.
“Margaret Hodge is hugely respected for her work scrutinising some of the UK’s largest and most high-profile publicly funded bodies. There’s no better qualified person to get to the bottom of the procurement process around the Garden Bridge, and establish whether Londoners have been getting value for money since the project began."
Hodge said: “It’s not a project that I have previously had an opinion on either for or against, but given the millions of pounds of public money allocated to the project, it is clear that there needs to be far more transparency around how funds are being spent. The planned bridge is a major project in an iconic part of London, and there are clearly questions that remain unanswered around issues like procurement.”
In an interview with the BBC last month, Heatherwick hit back at critics of the bridge, stating that any rejection of the project at this stage would show that “we have suddenly become a society who have no confidence in ourselves”.
"There's all sorts of people who want to get their little agenda and pin it onto this project,” he said. “But it’s an amazing project. How can it possibly be a bad thing to stitch the city together better, to create new public space that we have never had before, to create new views for all of us?”
He added that decision-makers must “hold their nerve” over the project.
In its most recent public statement, the Garden Bridge Trust has said construction on the bridge is not now likely to start until next year. Land deals and an agreement with Coin Street Community Builders, leaseholder of the land earmarked for the bridge’s south landing point, must be reached before building work can begin.
• The Garden Bridge Trust has stated that the total cost of the project is currently estimated to be £185m.
• £60m of public money has been pledged – with £30m from TfL and £30m from the Government.
• £20m of the money pledged by TfL is in the form of a loan to be repaid in full.
• Approximately £37m has already been spent from the total £60m pledged by Government and TfL.
• If the Garden Bridge is finished, then not only will the £20m loan be repaid to TfL, but the Garden Bridge Trust will need to pay approximately £22m in VAT to the Treasury – leaving an ultimate cost to the taxpayer of £18m.
Garden Bridge London Sadiq Khan Margaret Hodge Thomas Heatherwick Boris Johnson design architecture
Thomas Heatherwick urges backers of 'amazing' Garden Bridge 'to hold their nerve' as criticism mounts
Garden Bridge faces further uncertainty as new London mayor demands public funding scrutiny
Heatherwick's Garden Bridge moves closer to reality as engineers appointed
Crucial beakthrough reached in London Garden Bridge funding stand-off
Boris Johnson approves Heatherwick’s London Garden Bridge
GoCo Health Innovation City in Sweden plans to lead the world in delivering wellness and new science
Aman sister brand Janu debuts in Tokyo with four-floor urban wellness retreat
€38m geothermal spa and leisure centre to revitalise Croatian city of Bjelovar
Two Santani eco-friendly wellness resorts coming to Oman, partnered with Omran Group
Kerzner shows confidence in its Siro wellness hotel concept, revealing plans to open 100
Ritz-Carlton, Portland unveils skyline spa inspired by unfolding petals of a rose
Rogers Stirk Harbour & Partners are just one of the names behind The Emory hotel London and Surrenne private members club
Peninsula Hot Springs unveils AUS$11.7m sister site in Australian outback
IWBI creates WELL for residential programme to inspire healthy living environments
Conrad Orlando unveils water-inspired spa oasis amid billion-dollar Evermore Resort complex
Studio A+ realises striking urban hot springs retreat in China's Shanxi Province
Populous reveals plans for major e-sports arena in Saudi Arabia
Wake The Tiger launches new 1,000sq m expansion
Othership CEO envisions its urban bathhouses in every city in North America
Merlin teams up with Hasbro and Lego to create Peppa Pig experiences
SHA Wellness unveils highly-anticipated Mexico outpost
One&Only One Za’abeel opens in Dubai featuring striking design by Nikken Sekkei
Luxury spa hotel, Calcot Manor, creates new Grain Store health club
'World's largest' indoor ski centre by 10 Design slated to open in 2025
Murrayshall Country Estate awarded planning permission for multi-million-pound spa and leisure centre
Aman's Janu hotel by Pelli Clarke & Partners will have 4,000sq m of wellness space
Therme Group confirms Incheon Golden Harbor location for South Korean wellbeing resort
Universal Studios eyes the UK for first European resort
King of Bhutan unveils masterplan for Mindfulness City, designed by BIG, Arup and Cistri
Rural locations are the next frontier for expansion for the health club sector
Tonik Associates designs new suburban model for high-end Third Space health and wellness club
Aman sister brand Janu launching in Tokyo in 2024 with design by Denniston's Jean-Michel Gathy
The Peninsula London unveils Peter Marino-designed spa inspired by London’s famous parks
First glimpses revealed of Mandarin Oriental, Mayfair's subterranean spa retreat
"Architecture is alive" says Ma Yansong, as Shenzhen art museum opens exhibition showcasing work of MAD Architects
Why shouldn’t sports facilities be beautiful? Across Asia, architects are creating landmark buildings for the public, discovers Christopher de Wolf