Preparations for construction of £250m Therme Manchester project get underway

by Megan Whitby | 06 Sep 2022
Credit: Therme Group
We’re delighted to have reached this critical stage which marks the beginning of on-site works for Therme Manchester
– Richard Land

Plans to start work on the UK’s first city-based wellbeing resort, Therme Manchester, at TraffordCity have progressed this week with preparations to clear the current site.

Regeneration business Peel L&P has submitted plans to Trafford Council to demolish the 28,000sq m former EventCity conference and exhibition space to make way for the £250m (US$287.6m, €299m) flagship Therme Manchester development.

The resort is being built opposite Trafford Palazzo and The Trafford Centre by global developer and wellbeing destination operator Therme Group – an organisation which has run similar resorts across Europe over the past 20 years.

Attractions within the 28-acre resort will include an all-season urban beach, expansive thermal pools, a wellbeing spa, immersive digital art, an onsite urban farm, botanical gardens and a waterpark with the world’s first living waterslides.

A snow room, multi-sensory showers and oxygen rooms will also be on offer, as well as a visitor and education centre for events on sustainability, food and nature.

Therme anticipates the development will significantly boost economic growth in the region, creating 1,200 jobs and over £4.5bn (US$5.2bn, €5.2bn) economic impact.

By combining nature, sustainable technology and culture, Therme hopes to improve visitors’ health and wellbeing and save over 1 million hospital admission days per year.

Biodiversity will be central to Therme Manchester via a 10,000sq m wellbeing garden, hydroponic vertical farm, more than 1,500 trees and roof-top beehives which will produce honey for use in restaurants and wellbeing treatments.

Plans also involve the integration of biophilic design elements, including double-curved roofs, which reduce the amount of steel required, increasing the sustainability of the development.

In addition, the design includes a green ‘vertical forest’ multi-storey car park to remove the need for under-venue parking and reduce the amount of excavation needed thereby simplifying the build process and lowering environmental impact.

Richard Land, chief development officer for Therme Group UK, said: “We’re delighted to have reached this critical stage with Peel L&P, which marks the beginning of on-site works for Therme Manchester.

“An iconic project for the city as well as for the entire UK, this milestone confirms the arrival of Therme in the North. It also solidifies our vision for 90 per cent of the UK to be within easy reach of a Therme destination, with future developments planned for Glasgow, London and other key cities”.

The construction of Therme Manchester is set to begin in 2023, with a build time of approximately two years.

Therme has also outlined plans to expand its global footprint with new sites in Canada and Germany, as well as introducing urban wellbeing centres to five US cities, including New York, Los Angeles and Washington DC.

Therme Group  Therme Manchester 
Related stories
05 Apr 2022

Therme Group reveals updated design for £250m Therme Manchester Wellbeing Resort

16 Nov 2021

Therme Group to submit planning permission for £100m wellbeing facility in Glasgow

02 Aug 2021

Therme Group to expand global footprint with waterfront development in Toronto

FEATURE: Waterparks – Down to earth

FEATURE: Interview – Richard Land

FEATURE: Interview – Stelian Iacob

Plans to start work on the UK’s first city-based wellbeing resort, Therme Manchester, at TraffordCity have progressed this week with preparations to clear the current site. Regeneration business Peel L&P has submitted plans to Trafford Council to demolish the 28,000sq m former EventCity conference and exhibition space to make way for the £250m (US$287.6m, €299m) flagship Therme Manchester development. The resort is being built opposite Trafford Palazzo and The Trafford
WAT,ASW,HAF,SAB,TAW,VAT,AAC,ECO
Construction on Therme Manchester is set to kick off in 2023, with an expected build time of two years / Therme Group
More news
News stories: 1 - 30 of 8064     
 
 
 
News stories: 1 - 30 of 8064     
 
 
 
company profile
Company profile: Wellness & Spa Solutions
Founded in Italy and operating on a global scale, Wellness & Spa Solutions is a premier consultancy firm focusing on the fields of hydrothermal engineering and spa design.
Try cladmag for free!
Sign up with CLAD to receive our regular ezine, instant news alerts, free digital subscriptions to CLADweek, CLADmag and CLADbook and to request a free sample of the next issue of CLADmag.
sign up
Catalogue Gallery
Click on a catalogue to view it online
To advertise in our catalogue gallery: call +44(0)1462 431385
cladkit product news
Effe introduces sauna and hammam collection Baluar by Patricia Urquiola
The system uses heat-treated lime wood cladding, available in either a dark or light tone
Helen Andrews
Sauna specialist Effe (formerly Effegibi) has introduced its new sauna and hammam collection, Baluar, designed by architect and designer Patricia ...
OpenSeed launches private multisensory Iris Meditation Pod
The Iris Pod features vibro-acoustic technology, aromatherapy, light therapy, music, guided meditations and soundscapes
Helen Andrews
OpenSeed has launched its multisensory Iris Meditation Pod, designed in collaboration with Fuseproject – a design and innovation company founded ...
Porada launch retro-inspired coffee table
Porada's new Enook Brillo coffee table
Magali Robathan
Maurizio Marconato and Terry Zappa have created the Enook Brillo coffee table for Italian design studio Porada – a retro-inspired design ...
cladkit product news
LivinGlobe introduces redesigned adaptable Vidarium
LivinGlobe can install ultra short throw projections or premium LED panels, as well as the surround sound system and video server
Helen Andrews
Founded more than 10 years ago, LivinGlobe was one of the first companies in the immersive wellness space with its ...
New Balera collection embeds lighting in 
tiled feature walls
Studiotamat has teamed up with Ariana de Luca to create the Balera range
Magali Robathan
The new Balera Collection sees design studio Studiotamat team up with ceramic artist Arianna De Luca and lighting designer Ninefifty ...
Snow’s holistic cool-down: Embracing inclusivity in post-sauna rituals
Megan Whitby
In the world of wellness, the age-old tradition of sauna bathing is synonymous with relaxation, detoxification and rejuvenation. But, a ...
cladkit product news
Lucas Zito aims to show 3D printed lamps can be timeless design objects
Lucas Zito’s practice specialises in the design of lights through 3D printing
Magali Robathan
A collection of lighting from Paris-based designer Lucas Zito aims to reframe the idea of 3D printed objects as cheap ...
Heatherwick Studio and lighting brand Tala collaborate to create sleep light called Wake
Wake is crafted from hand-spun ceramic and pressed glass, behind which a gentle light emanates to improve sleep routines and wellbeing
Helen Andrews
Design firm Heatherwick Studio and British lighting brand Tala have teamed up to create a sleep light called Wake. The ...
TouchWood Play designs new kids’ club for Dubai’s Zuhha Island
The new club aims to connect children with nature
Magali Robathan
Bespoke play environment design and manufacturer TouchWood Play has announced that it is responsible for the creation of a new Kids’ ...
x
Sign up with CLAD for regular news updates