For any planned leisure development, rigorous site investigations are essential to establish a realistic project cost. Denis O’Brien, senior surveyor from international construction services company ISG – a key Alliance Leisure contractor – explains the basics of the process


For potential leisure projects, how important are the site investigations in the Alliance design and build process?
Site investigations may not be the most exciting part of the process to talk about, but without very detailed and rigorous surveys at this key stage, it’s impossible to come up with a realistic project cost. Alliance Leisure always works to a fixed price contract, so we need to know about every potential pitfall of the proposed development site.

What’s involved?
It depends whether we’re looking at a new build or an extension to an existing facility. There are obviously a lot more unknowns – particularly relating to the ground works – with a site that doesn’t already have a building on it.

We undertake ground investigation surveys, tree surveys, environmental impact surveys, assess the proximity and ease of access to utilities. We also try to look for the potential show-stoppers such as former coal mines or sink holes. Of course, there are always some things you can’t plan for which might significantly delay the start of the project, such as undiscovered munitions or archaeological remains, but in reality these are very rare occurrences.

When it comes to extensions and redevelopments, there’s another whole tier of investigations to carry out before the project can be accurately costed.

The majority of leisure centres we’re now redeveloping date back to the 60s and 70s, so we have to consider the presence of asbestos and the quality of the drains, as well as undertaking structural surveys to see if the existing structure can take the new load.

We also need to check whether the existing services provision is sufficient to supply a larger site, and carry out a dilapidation survey to check structures such as the original roof, which might be nearing the end of its life.

What are the site problems that add most to the budget?
If there are inadequate services, then the need, for example, to build a sub-station could easily add £100,000–£120,000 to the project cost.

With existing leisure centres, it might be that it’s best to knock down a quarter to a third of the existing building in order to properly develop the site.

However, in the case of older buildings, it’s almost always better to plan to replace some elements of the building right at the start, as the payback on this can be relatively quick. For example, we’ll always introduce modern, efficient lighting to any building project we’re working on from top to bottom, as the energy savings this yields over time can enable the leisure centre to recoup the cost of the capital outlay in just a few years.

It’s a false economy to cut elements like this out of the budget just to bring proposed costs down.

How do the site findings feed into the overall process?
On the basis of these investigations, we’re able to carry out a block planning exercise that comes up with the overall size and shape of the development, together with the content and what it will cost (usually within 10–15 per cent of the final fixed cost).

If there are any real show-stoppers at this stage, which is very rare, the client can choose to walk away and just bear the cost of the site investigations.

Sometimes, at this stage, the local authority might want to scale down some elements of the project to make savings.

If they proceed with the plan, the site investigation costs are absorbed into Alliance’s overall development costs. We then go on to commission architects, and draw up a more robust cost plan and a bill of quantities.

CASE STUDY

Jade Jones Pavilion Flint, North Wales

In July 2012, Alliance Leisure completed a £2m extension and refurbishment project at the Jade Jones Pavilion Flint in North Wales.

At the heart of the project was the redevelopment of the sports hall. After carrying out site investigations, Alliance discovered that it needed new pile foundations to take the weight of the new project proposals, which consisted of an eight-lane ten pin bowling alley on the ground floor, and a four-lane flat green bowling rink on a new mezzanine level.

Because of the poor soil structure on the site, Alliance contractor ISG used a mini continuous flight auger piling system to construct new foundations. Although this method comes at a higher cost, it meant minimum vibration and noise for the existing, occupied leisure centre, including the adjacent swimming pool facility. Choosing this building route meant The Pavilion was able to stay open for the entire 28-week build period, and therefore maintain its usual revenue stream.

Other facilities at the leisure centre include a fitness suite, a 25-metre swimming pool and children’s pool, café and licensed bar, and multi-activity studios for fitness and dance classes – along with a new pirate-themed children’s soft play area, which was added as part of the redevelopment project.

Follow the series

1. Scoping / Investigation
2. Conceptualisation
3. Viability assessment & full feasibility
4. Site investigation
5. Fixed price contracts
6. Overseeing the building work
7. Ordering phase
8. Client support (part 1)
9. Client support (part 2)

Gallery
Click on an image to open the image gallery
company profile
Company profile: Polin Waterparks
Design, engineering, manufacturing, installation of waterslides, waterparks and waterplay attractions. Polin has perfected hundreds of exclusive and successful projects all around the world: outdoor parks, indoor parks and hotel/resort packages, regardless of the project’s size.
Try cladmag for free!
Sign up with CLAD to receive our regular ezine, instant news alerts, free digital subscriptions to CLADweek, CLADmag and CLADbook and to request a free sample of the next issue of CLADmag.
sign up
Catalogue Gallery
Click on a catalogue to view it online
To advertise in our catalogue gallery: call +44(0)1462 431385
features
"Culture is the beating heart of this project"

Designed to restore neglected land and renew the identity of Iraq’s capital city, Baghdad Sustainable Forests promises a new way of living surrounded by nature. Gensler’s Ian Mulcahay tells us why he thinks the project could become a model for the repair and enhancement of urban centres

cladkit product news
OpenSeed launches private multisensory Iris Meditation Pod
The Iris Pod features vibro-acoustic technology, aromatherapy, light therapy, music, guided meditations and soundscapes
Helen Andrews
OpenSeed has launched its multisensory Iris Meditation Pod, designed in collaboration with Fuseproject – a design and innovation company founded ...
Heatherwick Studio and lighting brand Tala collaborate to create sleep light called Wake
Wake is crafted from hand-spun ceramic and pressed glass, behind which a gentle light emanates to improve sleep routines and wellbeing
Helen Andrews
Design firm Heatherwick Studio and British lighting brand Tala have teamed up to create a sleep light called Wake. The ...
TouchWood Play designs new kids’ club for Dubai’s Zuhha Island
The new club aims to connect children with nature
Magali Robathan
Bespoke play environment design and manufacturer TouchWood Play has announced that it is responsible for the creation of a new Kids’ ...
cladkit product news
Lucas Zito aims to show 3D printed lamps can be timeless design objects
Lucas Zito’s practice specialises in the design of lights through 3D printing
Magali Robathan
A collection of lighting from Paris-based designer Lucas Zito aims to reframe the idea of 3D printed objects as cheap ...
Porada launch retro-inspired coffee table
Porada's new Enook Brillo coffee table
Magali Robathan
Maurizio Marconato and Terry Zappa have created the Enook Brillo coffee table for Italian design studio Porada – a retro-inspired design ...
Effe introduces sauna and hammam collection Baluar by Patricia Urquiola
The system uses heat-treated lime wood cladding, available in either a dark or light tone
Helen Andrews
Sauna specialist Effe (formerly Effegibi) has introduced its new sauna and hammam collection, Baluar, designed by architect and designer Patricia ...
cladkit product news
New Balera collection embeds lighting in 
tiled feature walls
Studiotamat has teamed up with Ariana de Luca to create the Balera range
Magali Robathan
The new Balera Collection sees design studio Studiotamat team up with ceramic artist Arianna De Luca and lighting designer Ninefifty ...
Snow’s holistic cool-down: Embracing inclusivity in post-sauna rituals
Megan Whitby
In the world of wellness, the age-old tradition of sauna bathing is synonymous with relaxation, detoxification and rejuvenation. But, a ...
LivinGlobe introduces redesigned adaptable Vidarium
LivinGlobe can install ultra short throw projections or premium LED panels, as well as the surround sound system and video server
Helen Andrews
Founded more than 10 years ago, LivinGlobe was one of the first companies in the immersive wellness space with its ...
x
Email this to a friend or colleague
I am happy for Leisure Media to contact me occasionally by email and understand that I can opt out at any time.
Promotional Feature: Alliance Leisure
Part four of a nine-part series detailing Alliance Leisure's process for creating successful public leisure facilities - For any planned leisure development, rigorous site investigations are essential to establish a realistic project cost