Rio 2016 Olympic Park declared ‘92 per cent complete’
Construction work at Barra Olympic Park, the main competition cluster for the Rio 2016 Olympics, is now 92 per cent complete.
In its latest update on building progress, Rio de Janeiro’s city government announced that 12 venues across the two main Olympic Parks – Barra and Deodoro – are now “nearly complete”, compared with six venues last month (September 2015).
In Barra, finishing touches are being made to the athletes’ village (97 per cent), Olympic Aquatics Centre (94 per cent complete) and Future Arena (96 per cent), while work is still needed on the Olympic Tennis Centre (80 per cent) and the Rio Olympic Velodrome (70 per cent).
For a video animation on the progress made at Barra, click here.
Work is also progressing well at Deodoro Olympic Park, the second largest competition cluster, where work on two venues – the BMX and mountain bike courses – is complete.
When complete, the Olympic Park – masterplanned by AECOM – will be a lagoon-side peninsula with a network of 15 sports venues.
Located in the Barra da Tijuca district, the main Olympic park will be anchored around three existing stadiums, used for the 2007 Pan-American Games, which were constructed over a Formula One racetrack from the 1970s.
Seven new stadiums will be constructed on the site. These include a new handball arena, designed by London studio AndArchitects in collaboration with Rio-based Lopes, Santos & Ferreira Gomes; and a Velodrome, designed by 3DReid in partnership with local form BLAC Architects.
The opening ceremony of the Rio 2016 Games will take place on 5 August and the event will run until 21 August.
For more details on the Rio Olympic Parks and facilities, click here for the venues map for Rio 2016.
• The progress will come as a relief to the International Olympic Committee (IOC). In April 2014, IOC vice president John Coates described the preparations for the 2016 Games as “the worst ever seen”.
He said progress on the Rio’s infrastructure and venues – with two years to go at the time – was worse than it was for the Athens Games in 2004, which was notorious for delays in construction.
Rio 2016 signs up Dow to provide ‘most comprehensive carbon programme’ in Games history
Warm up tennis event in Rio postponed because of construction delay
IOC chief: Rio 2016 preparations 'worst ever'
UAE’s first Dior Spa debuts in Dubai at Dorchester Collection’s newest hotel, The Lana
Europe's premier Evian Spa unveiled at Hôtel Royal in France
Clinique La Prairie unveils health resort in China after two-year project
GoCo Health Innovation City in Sweden plans to lead the world in delivering wellness and new science
Four Seasons announces luxury wellness resort and residences at Amaala
Aman sister brand Janu debuts in Tokyo with four-floor urban wellness retreat
€38m geothermal spa and leisure centre to revitalise Croatian city of Bjelovar
Two Santani eco-friendly wellness resorts coming to Oman, partnered with Omran Group
Kerzner shows confidence in its Siro wellness hotel concept, revealing plans to open 100
Ritz-Carlton, Portland unveils skyline spa inspired by unfolding petals of a rose
Rogers Stirk Harbour & Partners are just one of the names behind The Emory hotel London and Surrenne private members club
Peninsula Hot Springs unveils AUS$11.7m sister site in Australian outback
IWBI creates WELL for residential programme to inspire healthy living environments
Conrad Orlando unveils water-inspired spa oasis amid billion-dollar Evermore Resort complex
Studio A+ realises striking urban hot springs retreat in China's Shanxi Province
Populous reveals plans for major e-sports arena in Saudi Arabia
Wake The Tiger launches new 1,000sq m expansion
Othership CEO envisions its urban bathhouses in every city in North America
Merlin teams up with Hasbro and Lego to create Peppa Pig experiences
SHA Wellness unveils highly-anticipated Mexico outpost
One&Only One Za’abeel opens in Dubai featuring striking design by Nikken Sekkei
Luxury spa hotel, Calcot Manor, creates new Grain Store health club
'World's largest' indoor ski centre by 10 Design slated to open in 2025
Murrayshall Country Estate awarded planning permission for multi-million-pound spa and leisure centre
Aman's Janu hotel by Pelli Clarke & Partners will have 4,000sq m of wellness space
Therme Group confirms Incheon Golden Harbor location for South Korean wellbeing resort
Universal Studios eyes the UK for first European resort
King of Bhutan unveils masterplan for Mindfulness City, designed by BIG, Arup and Cistri
Rural locations are the next frontier for expansion for the health club sector
Tonik Associates designs new suburban model for high-end Third Space health and wellness club
Bionic leaves, breathable metals and selfgrowing bricks... Biomimicry in architecture has come a long way. Christopher DeWolf takes a look at the latest advances