£7m Dollan Aqua Centre revamp completed
East Kilbride's Dollan Aqua Centre has reopened to the public following the completion of a £7m refurbishment of the Grade A-listed venue, which was carried out by Clark Contracts.
The renovation of the complex - originally designed by Alexander Buchanan Campbell and first opened in 1968 - included structural works and new floor, wall and ceiling finishes. Among the facilities at Dollan Aqua Centre is one of Scotland's five 50m competition pools and a health suite comprising a sauna, a steamroom, a sanarium and a spa bath.
A gym equipped with Life Fitness cardiovascular machines and HUR resistance equipment; a dance studio; water flumes; a crèche; and a coffee shop are also on offer at the complex. Barr + Wray was appointed to undertake a £300,000 filter contract as part of the renovation, which included a revamp of the main pool's three filter vessels and fabrication of a fourth.
Alister MacDonald, managing director of Barr + Wray, said: "The work we have carried out to modernise and improve efficiency at Dollan Aqua Centre will generate long-term public savings." South Lanarkshire Leisure and Culture operates the venue on behalf of South Lanarkshire Council.
BIG unveils Eve Music Hall as Croatia venue nears completion
Bob Rogers hands BRC to long-serving leadership team
Wellness care hospital opens in Vilnius with innovative spa and hospitality concept
Universal and Puy du Fou projects point to rise of Oxford–Cambridge corridor
A proposed Puy du Fou development near Bicester and Universal Destinations and Experiences’ planned resort in Bedford are emerging as part of a wider transformation of the Oxford–Cambridge Growth Corridor into a major centre for UK leisure and tourism investment.
For years, the corridor has been associated primarily with science, technology, housing and university-led economic growth. However, the clustering of large-scale visitor attraction projects along the
All-inclusive eco-wellness development Auko to open near Vietnam’s Son Doong caves
Shedd Aquarium upgrades its visitor experience with new Immersion Theater
Shedd Aquarium has opened the Immersion Theater developed in partnership with SimEx-Iwerks, as part of a wider strategy to enhance the guest experience and create additional revenue opportunities.
The attraction has transformed the aquarium’s Phelps Auditorium into a multi-sensory venue combining panoramic projection, environmental effects and interactive technology.
A new pre-show area allows visitors to engage with augmented reality marine animals before entering the
Mandarin Oriental announces standalone Mansions-branded residences for Abu Dhabi
MCR is planning a luxury hotel for London's BT Tower
Joy as a radical act: Yinka Ilori launches solo exhibition celebrating the rebellious power of spreading happiness
Work gets underway on Madrid's €800 million leisure complex
Work is underway in Madrid on one of Europe’s most significant multi-functional complexes, combining sport, entertainment, culture and education.
The €800 million initiative to regenerate the former Olympic Aquatic Centre in the north-east of the city, next to the Riyadh Air Metropolitano stadium, is being led by Barsento – a joint venture between Live Nation Entertainment, Oak View Group and Atlético de Madrid. The project will
Therme Manchester reveals 90:90 strategy – 90 per cent of the UK population within a 90-minute drive of a Therme
Four Seasons’ Naples Beach Club opens 2,800sq m Sanctuary spa inspired by indigenous Calusa people
Orient Express Corinthian to host Ocean Rebirth wellness retreat in collaboration with Guerlain
Famed London nightclub, Tramp, launches Tramp Health
First look: Miraval opens on the Red Sea in Saudi Arabia
Hainan Science Museum by Ma Yansong, opens in China
A new science museum has opened to the public in Haikou after attracting more than 350,000 visitors during a four-month soft opening period.
Designed by Ma Yansong and his practice MAD Architects, the Hainan Science Museum is located on the edge of Wuyuan River National Wetland Park and has already recorded peak attendance of more than 5,800 visitors in a single day.
Commissioned by



















